Sacramento Northern Railway

Sacramento Northern Railway
Reporting mark SN
Locale Central and Northern California
Dates of operation 1918 (began December 27, 1904 under the Northern Electric brand before the rename to Sacramento Northern)[1]–1983 (upon purchase by Western Pacific)
Track gauge 4 ft 8 12 in (1,435 mm) (standard gauge)
Headquarters Marysville, CA [2]

The Sacramento Northern Railway was originally a 93-mile (150 km) electric interurban railway linking Chico in northern California to the California capitol of Sacramento The original name of the line was the Chico Electric Railway, or CERY. CERY was sold after a few months of operation to the Northern Electric Railway. That line went into bankruptcy in 1914, with the new Sacramento Northern Railroad investors ready to buy it. Ownership of the Sacramento Northern Railroad was changed over to the Western Pacific in 1922 retaining the name Sacramento Northern Railroad. The Sacramento Northern Railway was created in 1925 as a new subsidiary of the WP to handle the growing collection of WP interurban railroad holdings. On November 4, 1925, the SN Railway purchased the SN Railroad. By retaining the SN as a subsidiary, Western Pacific received more income when interchanging freight with the Sacramento Northern due to fees earned from freight interchange between one railroad to another. Western Pacific also owned regional sister electric railroads Tidewater Southern (Stockton to Modesto) and Central California Traction (Stockton to Sacramento).[6] Passenger service ceased in 1941, and the system operated as a shortline freight-hauling railroad thereafter.[4]

The SN was created out of two different established interurban railroads:

The two divisions used different voltages as well as different methods of current colection, thus only some interurban cars and freight locomotives could traverse the entire Chico to Oakland route.[4] When in Oakland, SN coaches used Key System tracks and had to drop the trolley pole and raise a pantograph. Some equipment carried a third rail shoe, a trolley pole, and a pantograph.[7]

At 185 miles, the SN was one of the longest interurban lines in the nation and was built and operated to very high standards. As with most interurban railroads in the United States, its return on initial investment was lower and its annual operating costs were higher than had been projected at conception. Interurbans as well as most railroads found themselves more labor intensive than expected, particularly in the shops maintaining rolling stock.[3] SN passenger business was less than projected and became increasingly unprofitable, even after SN reached downtown San Francisco via the new San Francisco – Oakland Bay Bridge in 1939.[4][7] Freight service became the lifeblood of the railroad, keeping it in profit long after passenger service had ceased. Although it had a somewhat shorter route from Oakland to Pittsburg/Antioch in competing with the Santa Fe and Southern Pacific steam railroads, its route through the Oakland Hills was very steep (4%) and curvy by railroad standards and had on street operation.[4] Freight trains usually consisted of just a few cars on those grades with locomotives ("juice jacks") at both ends of the train.[1][4][5][7] From Sacramento north to Chico, the SN had direct competition with the Southern Pacific Railroad and, up to 1922, with the Western Pacific. It traversed rural farming country containing only Marysville-Yuba City as major towns before reaching Chico. Thus passenger business north of Sacramento was light and could not be expected to increase much over time. The SN had branches to Vacaville, Woodland, Colusa, and Oroville. (cited: three Interurban Press publications regarding the history of the Sacramento Northern.)

Contents

History

In 1928, the San Francisco-Sacramento Railroad (formerly the Oakland, Antioch and Eastern Railway, and originally the Oakland and Antioch Railway) was added as the SN's Southern Division or "South End".

The combined high-speed main line stretched for 185 miles (298 km) between San Francisco and Chico. At the southern end, the railway shared the facilities of the Key System; at first, the Key Pier facility in Oakland, then the crossing of the Bay Bridge into San Francisco's Transbay Terminal from 1939.[4]

The railway's fortunes were struck a heavy blow by the Great Depression and the rise of the automobile. Interurban passenger service was ended in 1941, while streetcar service in Chico continued until 1947. Other impacts to the company were the 1951 Lisbon Trestle Collapse [1][4]in which crewmen were hurt and a long causeway trestle needing rebuilding [1], and the withdrawal of the Sacramento Northern's aging ferry, "Ramon".[5]

Freight service continued and was heavy during World War II. In 1944, the railroad received its first diesel locomotives, which began the process of de-electrification. All electric operation ceased in 1965, after which the railway operated as a minor freight subsidiary of the Western Pacific. Trackage was abandoned over the years, especially that which duplicated routes on other railroads. The SN name ceased to exist with the WP's acquisition by the Union Pacific in 1983. SN's seniority list continued and is still in use by the Union Pacific, although it is doubtful that many former WP/SN employees remain employed today.

The SN line connecting the California ghost towns of Montezuma, Dozier, and Cannon in Solano County is now owned and operated by the Western Railway Museum as a heritage railway. Much of the SN's former equipment is part of the museum's permanent collection.

Timeline

Route

Oakland to Sacramento

Although the SN's Oakland Yard at 40th and Shafter was the end of its right-of-way, its trains continued west along 40th St. on the tracks of the Key System and on to the Key System's "mole". In later years, the trains ran over the San Francisco – Oakland Bay Bridge which was built near the site of the Oakland Mole pier, to San Francisco's downtown Transbay Terminal, connecting by way of the Key's tracks on Yerba Buena Ave and 40th Street. This service ended with the railroad's passenger service in 1941, but freight interchange with the Key System continued until that system's demise.

The terminus of the SN's right of way in Oakland was a compact yard on the corner of 40th Street and Shafter Avenue. The main line ran on single track north up the center of narrow Shafter Street in a residential area. At the end of Shafter, the track crossed College Avenue and started a long curving 4% grade into the Oakland Hills in the Rockridge district of Oakland. It then skirted Lake Temescal on its eastern shore and ran southeast through the Montclair district of Oakland. It crossed into Montclair over a trestle at Moraga Ave. and Thornhill Dr., then ran along a high berm between Montclair Recreation Center and Montclair Elementary School, before crossing Mountain Blvd and Snake Road via trestle. High above the northwest side of Shepherd Canyon, the line headed east, then made a sharp turn northeast as it passed through a major cut in the hill. It then climbed up Shepherd Canyon to a station called "Havens" at Paso Robles Dr., named for real estate developer Frank C. Havens, one-time partner of the Key System's "Borax" Smith who was trying to encourage sales in Shepherd Canyon. At Havens, below Saroni Drive, the line entered a short ravine leading to the entrance of a one mile long single-track tunnel under the Oakland Hills. The tunnel itself is still intact but is sealed at both ends. In 1994, home developers filled in the approach ravine and tunnel mouth and constructed residential homes on this fill and on top of the tunnel. The upper foot of the top of the tunnel portal could be observed in the back yard of one of the new homes. A home further northeast behind the first was constructed on top of the unlined tunnel, and by altering drainage in the area caused the tunnel below the home to slowly subside. The home shifted and dropped and had to be removed.

The SN track exited the tunnel into Contra Costa County at Pinehurst Road near Huckleberry Botanic Regional Preserve, and immediately entered a sharp 90-degree curve adjacent to and bridged over Pinehurst Road to run southeastward through Redwood Canyon. Although technically oriented to the northeast (perpendicular to the axis of the hills), the railroad designated a station just outside the tunnel portal as "Eastport." The tunnel portal is no longer visible, largely as a result of a landslide which occurred during the El Niño rains of the early 1980s. The right of way was located along an extant fire trail just west of the spot where Pinehurst Road makes a sharp u-turn. This fire trail was previously known as Winding Way on some maps, and was originally an old 19th century logging road built by Hiram Thorn, for bringing redwood logs out of the Moraga Redwoods and to his mill, and then over the mountain into Oakland. Even earlier, the route up the canyon to what is now Huckleberry preserve was a cattle trail for the Spanish and Mexican ranchers, en route to a landing at the mouth of Temescal Creek on San Francisco Bay.

At the sharp curve at Eastport, the tracks immediately crossed over Pinehurst road on a bridge. The right-of-way then headed down Redwood Canyon on a ledge (still apparent today) just above Pinehurst Road, progressing southeast along the valley past the small community of Canyon. The line then turned north to Moraga, past St Mary's, and thence northeasterly through Lafayette, Saranap, and the valley past Walnut Creek and to Concord and Pittsburg. Some of the right of way through Contra Costa County is now used by the BART system to Concord. At Pittsburg, the tracks ran parallel, adjacent, and south of the Santa Fe and the Southern Pacific main lines, then dropped down into a viaduct, turned north sharply and went under the SF and SP through an underpass to almost immediately reach the SN ferry landing on Suisun Bay. (This track layout and underpass are still shown on a 2009 Google website map of Pittsburg.) The Pittsburg side ferry landing and depot was called "Mallard" by the SN. There, a ferry boat (the Ramon) carried an entire passenger train across to a north side landing near Suisun called "Chipps" on Chipps Island. From here, the line proceeded north across an extensive marshland on a long trestle. After the trestle, the tracks continued north through farmland past Montezuma, Rio Vista Junction, Creed (where there was a branch west to Vacaville and Travis Airforce Base), and on to Dozier and Yolano before continuing on the four mile long Lisbon trestle (which collapsed in July 1951 as a steeple cab powered freight train of steel plate for Pittsburg was crossing it) into West Sacramento, then entered the city of Sacramento by way of the "M" Street Bridge (1911), and later by way of its replacement (1935), the Tower Bridge, which is still in use. At West Sacramento, just west of the Tower Bridge, the line to Woodland left the southbound main line and headed west. The SN progressed through downtown streets onto I Street to reach the substantial columned two story brick and stone "Union Terminal" on I Street between 11th and 12th. Union Terminal, also used by Central California Traction trains to Stockton in the early years, is now gone after use in the 1950s-1960s as a grocery store. Downtown Sacramento streets, particularly east and south of the Tower Bridge, carried many SN and Central California Traction tracks.

Freight service from Oakland to Lafayette ceased on March 1, 1957. Overhead wire and tracks were removed and the Shepherd Canyon tunnel sealed. The former roadbed from St Mary's College through Lafayette was converted to the popular Lafayette-Moraga trail. The following year, freight service only extended from Walnut Creek to Sacramento. The Ferry "Ramon" was removed from service in 1954, thus creating a divide between Mallard at Pittsburg and Chipps Island. To overcome this limitation, SN, through parent Western Pacific, had obtained trackage rights on the SF from Stockton to Pittsburg where SN trains could reach SN tracks and online freight shippers in Pittsburg and Concord. When the Union Pacific absorbed Western Pacific/SN, it obtained further trackage rights on the SF which extended to Port Chicago where SN had a small yard. Thus, Pittsburg trackage was removed in the early 1990s. (As of 2009, Google and MapQuest maps acquired by web searching "Rio Vista CA" shows original SN track and sidings (most now abandoned) at Pittsburg and north of Suisan Bay including the northward turn under the SF & SP to the Suisun Bay shore. The track Rio Vista-Creed is still shown as SN.) At Rio Vista Junction is the present California Electric Railway museum and active electrified track.

Sacramento to Woodland Branch

The electrified Woodland branch line left the Oakland bound main line at West Sacramento and ran 16 miles (26 km) straight west toward Woodland (known as the Yolo Shortline RR until 2003 and now known as the Sierra Northern Railway)[2]. The track proceeds across a very long elevated wood viaduct-bridge over the wide Yolo flood plain to enter Woodland and go down Main Street to the Woodland Opera House where the interurban cars turned around. Today SERA terminates shortly before East Street several blocks east of the Opera House. The Woodland terminal was a unique Mission-style structure and was recently reconstructed. The Sacramento bound interurban cars exited the terminal onto Main Street through a unique archway in the station wall.

Sacramento to Marysville to Chico

From the Sacramento depot at present day Terminal Way, the SN's "North End" ran north up 11th Street to a Northern Electric-built girder bridge crossing the American River and then proceeded to Rio Linda. The line continued to E. Nicolaus, then Marysville where it crossed the Feather River into adjacent Yuba City, split off the branch to Colusa, then went on to Live Oak, split off the branch to Oroville, then to Gridley and to Chico where it terminated. In Chico there were yards and primary shops. From a junction just northwest of Yuba City, another branchline ran west to Meridian and Colusa. It crossed the Sacramento River at Meridian on a narrow combined rail and vehicle bridge. From Yuba City to Meridian the track ran alongside and north of the Colusa Highway, California route 20. In 1992 this track and unusual Meridian bridge were still in use and provided the SN with a Southern Pacific-Union Pacific interchange at Colusa. As of 2009, Google website maps still show the former SN trackage in most areas alongside Route 20.

Terminals and Stations

The first Sacramento interurban terminal (for Northern Electric Ry) was at Eighth and J Streets. Sacramento's final interurban terminal was on I Street between 11th and 12th. This was called Union Station and served both SN and the Central California Traction. The terminal at Woodland (close to the Woodland Opera House) was unusual in that the interurban cars swung around behind it, loaded passengers, then emerged through an arch in the station wall to re-enter the street. This terminal was close to the Woodland Opera House, a unique facility for such a small town.

Technical information

Electrification

Because of interconnection with the Key System, SN cars had to operate under a number of different electrical standards. The North End was electrified at 600 volts DC, the nationwide standard trolley and interurban voltage at the time of construction. Trolley wire and trolley poles were used only in urban areas. In the open country, the line used a solid, uncovered top-contact third rail. Cars built originally for the North End could not operate south of Sacramento. The South End (former OA&E, Oakland, Antioch, and Eastern) was electrified largely at 1,200 volts dc until 1936, after which it operated at 1,500 volts, with areas of 600 volts in Oakland and Sacramento.

The interurban cars had to use a pantograph rather than the trolley pole on Key System rails (electrified at 600 volts) and over the Bay Bridge (electrified at 1,200 volts for the Southern Pacific); the Key System used a covered top-contact third rail over the bridge. Because of the Key System's third rail, cars that could traverse the whole system had to have their third rail shoes removed, since the top-contact shoes would have fouled the Key System rail's cover. They were normally added or removed in Sacramento. Such all-line capable cars were switchable between 600 V and 1,200 V operation; they could also operate at half power at the 1,200 V setting on 600 V overhead.

The SN's south end high-quality electrification used catenary rather than a single trolley wire, leading to the eventual exclusive use of pantographs rather than trolley poles south of Sacramento. Catenary allows the vertical supporting poles to be spaced farther apart than if a single suspended trolley wire is used, plus it is better for pantograph operation at speed due to stability. (The South Shore line uses pantographs with a single trolley wire in Michigan City streets but has catenary for high speed operation elsewhere.)

Suisun Bay crossing

Planned bridge

The Oakland, Antioch and Eastern needed to cross Suisun Bay, and chose to do so between West Pittsburg and Chipps Island, a gap of 2,600 feet (790 m). The bay saw heavy shipping traffic and thus a high-level drawbridge with long approaches was required. Construction began in 1912; the estimated price tag was $1.5 million and construction time was estimated as two and a half years. This would have delayed the opening of the railway, and so an alternative plan of a ferry service was implemented as a temporary measure. Construction of the bridge stopped in May 1913 after construction of the pier on the Contra Costa County side, because of a shortage of funds. The railway, not meeting revenue expectations, never did restart construction, and the "temporary" ferry service became permanent.[3]

Car ferry service

The railway was one of only two interurbans to operate a car ferry, and was the longer and more ambitious of the two. The first ferry constructed, the 186-foot (57 m) Bridgit (a pun on "Bridge It") was constructed of wood in San Francisco and launched in July 1913. It was destroyed by fire on May 17, 1914.

After unsuccessful experiments with an unpowered barge, the railroad rented car floats from other railroads in the area and commissioned a new, steel ferry from the Lanteri Shipyard in nearby Pittsburg. The Ramon was constructed entirely from flat steel plate to save time, and had no curved surfaces on its hull. It was double ended with a central, raised bridge in the typical carfloat style. Power was by a 600 horsepower (450 kW) distillate engine, one of the largest constructed, which was insufficient to counteract high winds and currents in the bay.

Three tracks were installed on the deck, all long enough to carry three passenger cars or five freight cars. All three could not be used at the same time; the central track overlapped the other two, and either the single central track or the two outside tracks could be used, depending on load. All tracks were equipped with powered trolley wire.

The Ramon was retired in 1954 after a Coast Guard inspection determined that the hull plating was no longer in a safe condition, and it was scrapped locally.

Today

See also

Notes

References

External links